Chemicals from the Coal Facility of Eastman Chemical Company was the first in the United States to use coal rather than petroleum as a raw material in the commercial production of acetyl chemicals — important building blocks in the synthesis of a wide range of consumer products. The plant, located in Kingsport, Tennessee, began operation in 1983 after more than a decade of planning and construction, prompted by the oil embargoes of the 1970s. By substituting locally available, high-sulfur coal, this process conserves petroleum previously required for the production of these high-volume chemicals.
Society
Main Category
Sub Category
Era
Date Created
Location Country
us
Coordinates
36.535605, -82.55037
Address1
200 South Wilcox Drive
City
Kingsport
State
Country
Zip
Creator
The Eastman Chemical plant was the first in the United States to use coal rather than petroleum as a raw material in the commercial production of acetyl chemicals – important building blocks in the synthesis of a wide range of consumer products, including plastics, textile fibers, and photographic film.
Image Credit
Courtesy Eastman Chemical Company.