Studies on the feasibility of building a hydro plant in the site were initiated in 1893. The increasing need for power that was cheaper and easily adapted to mine underground use drove the Lota coal mine company to develop a study of alternatives for this purpose. Engineer William E. Raby traveled to the United States and Europe to assess the use of electricity generation and transmission. The availability of the Chivilingo hydro resources arose as a better alternative to a steam plant.
Chile
YearAdded:
Image Credit: Courtesy Wikicommons/B.diaz.cEra_date_from: 1897
2001
The bridge is 408 meters long and weighed approximately 1,500 metric tons when built. Originally supported by four columns, two more were added in later years to support the weight of heavier rail cars.
YearAdded:
Image Credit: Courtesy Flickr/Rafael Retamal (CC BY-SA 2.0)Era_date_from: 1890
1994
Innovations
The bridge is 408 meters long and weighed approximately 1,500 metric tons when built. Originally supported by four columns, two more were added in later years to support the weight of heavier rail cars.
In the late 19th century, the Malleco River represented the border between the…
Read MoreStudies on the feasibility of building a hydro plant in the site were initiated in 1893. The increasing need for power that was cheaper and easily adapted to mine underground use drove the Lota coal mine company to develop a study of alternatives for this purpose. Engineer William E. Raby traveled… Read More